The average CAD consumption calculation is needful to the garments sector. The CAD consumption is also a vital part of the performance of the cutting department. When the cutting department is working on cut panels in various colors and styles. The department will unable to report accurate CAD consumption. That time he will be dependent on average CAD consumption for accurate reporting. The below example is for your reference-
Buyer Name: RH style 8MS038 | ||||||||
Colour : blue print c19 Garments qty = 8009 pc = 18.63 + 2.71 % = 12771 yds (body) | ||||||||
Colour : blue print c19 Garments qty = 7566 pc = 0. 51 + 4 % = 335 yds ( trim) | ||||||||
Colour : maroon print c58 Garments qty = 7566 pc = 18.97 + 3.01 % = 12322 yds (body) | ||||||||
Colour : maroon print c58 Garments qty = 8009 pc = 0.50 + 4 % = 347 yds (trim) | ||||||||
Sample fabric = 87 yds | ||||||||
Total fabric qty = 25862 YDS |
A) | blue print c19 Garments qty = 8009 pc | 18.63 | 2.74% | |||
blue print c19 Garments qty = 8009 pc | 0.51 | 4.00% | ||||
Total | 19.14 | 6.74% | ||||
B) | maroon print c58 Garments qty = 8009 pc | 18.97 | 3.01% | |||
maroon print c58 Garments qty = 8009 pc | 0.50 | 4.00% | ||||
Total | 19.47 | 7.01% | ||||
C) | Final Cad Consumption & Excess % Calculation: | |||||
RH style 8MS038 | ||||||
Total = | A+B | 38.61 | 13.75% | |||
Avg.= | (A+B)/2 | 19.31 | 6.88% |
So, We can easily identify the accurate CAD consumption on the above calculation.
(Visited 141 times, 1 visits today)